| Occupancy and use IBC Ch. 3 and mixed-occupancy provisionsIn the KB → | EEstablish Classify intended uses from the program. Flag mixed-occupancy conditions and the likely approach: accessory, separated, or nonseparated. | VValidate Test the classification against the actual plan: room uses, occupant loads, and accessory-area limits as spaces take shape. | RRevalidate Recheck when the program moves: a meeting room picks up event use, a tenant changes, an accessory area outgrows its allowance. | DDocument Code plans show occupancy by area, with occupant load calculations that agree with the current model. | RRevalidate Reviewer questions about use or classification are resolved and carried through every dependent sheet. | RRevalidate Owner-driven program revisions and tenant changes after permit can alter classification. |
| Construction type and building size IBC Ch. 5 and 6: height, stories, area | EEstablish Test allowable height, stories, and area for candidate construction types, including sprinkler and frontage increases. | VValidate Confirm massing against allowable area as floor plates, story count, and frontage are set. | RRevalidate Recheck when area or story count changes, or when changes to structural framing, materials, or assemblies affect the selected construction type. | DDocument Area calculations, construction type, and required element ratings recorded in the code analysis. | RRevalidate Reviewer questions on area calculations, increases, and the separations used to justify them. | RRevalidate Material and assembly substitutions checked against the required construction type. |
| Egress and life safety IBC Ch. 10In the KB → | EEstablish Estimate occupant loads and exit counts. Set the stair, core, and exit-discharge assumptions the plan will be organized around. | VValidate Test exit count, exit separation, common path, and travel distance against the emerging plan. | RRevalidate Door swings, corridor widths, dead ends, and egress capacity rechecked as layouts, doors, and furniture are detailed. | DDocument Life-safety plans: occupant loads, egress paths, travel distances, exit capacity, and signage. | RRevalidate Egress comments rarely stay on one sheet. Trace each response back to every affected plan and schedule. | RRevalidate Field changes to partitions, doors, hardware, and furniture layouts. |
| Accessibility IBC Ch. 11, ICC A117.1, ADA Standards, Fair Housing, state requirements | EEstablish Identify which accessibility standards apply, and which state or federal requirements sit alongside the building code. Determine applicable requirements, including required accessible units, features, and spaces where relevant. | VValidate Accessible routes, entrances, vertical access, and the distribution of accessible units or spaces in the plan. | VValidate Clearances become testable as rooms are detailed: door maneuvering space, turning space, toilet room layouts, reach ranges. Recheck them every time a room is re-planned. | DDocument Enlarged plans, mounting heights, and details that make the clearances buildable. | RRevalidate Reviewer comments on clearances and counts carried back into plans, elevations, and details. | VValidate Verify field dimensions, fixture substitutions, and hardware. Small changes erode clearances that were compliant on paper. |
| Fire resistance and separations IBC Ch. 7 and rating tablesIn the KB → | EEstablish Identify separations implied by the occupancy mix and construction type, and exterior wall ratings driven by fire separation distance. | VValidate Locate fire walls, barriers, and shafts. Test exterior wall openings near property lines against allowable limits. | VValidate Select rated assemblies. Locate doors, glazing, and penetrations. Check continuity where rated walls meet floors, roofs, and shafts. | DDocument Rated wall plans, assembly references, opening protective ratings, and penetration and joint details. | RRevalidate Reviewer comments on ratings and continuity resolved across plans, sections, and details. | VValidate Submittals for doors, dampers, glazing, and firestopping checked against the required ratings. |
| Plumbing fixtures IPC Ch. 4 / IBC Ch. 29, or the locally adopted plumbing code | EEstablish Estimate fixture counts from occupant load and occupancy. Confirm which plumbing code the jurisdiction has adopted. | VValidate Size and locate toilet rooms against required counts and travel distance to facilities. | RRevalidate Recheck whenever occupant load or occupancy changes. Confirm accessible fixtures and separate-facility requirements. | DDocument Fixture calculations and schedules that agree with the plans. | RRevalidate Count and ratio comments reconciled with architectural and plumbing drawings. | RRevalidate Revisit if tenant use or occupant load changes during construction. |
| Energy IECC or ASHRAE 90.1, plus any local stretch code | EEstablish Identify the adopted energy code, climate zone, any stretch code, and the intended compliance path, such as prescriptive or performance. | VValidate Test window-to-wall ratio, envelope, and orientation assumptions against the chosen path. | RRevalidate Assemblies, glazing, and systems rechecked. A change of compliance path has consequences well beyond the envelope. | DDocument Envelope values, assembly documentation, and the compliance forms the jurisdiction requires. | RRevalidate Energy comments resolved across architectural, mechanical, and electrical documents. | VValidate Glazing and insulation substitutions checked against documented values; commissioning where required. |
| Jurisdiction-specific requirements and amendments Adopted editions, local amendments, state codes, local interpretationsIn the KB → | EEstablish Confirm adopted code editions, local amendments, and applicable state codes. Note known local interpretations and unusual conditions. | VValidate Test unusual conditions against local practice, through pre-application meetings where the jurisdiction offers them. | RRevalidate Monitor adoption and effective dates. The governing edition at permit may differ from the edition assumed at pre-design, depending on jurisdiction-specific transition and vesting rules. | DDocument The code analysis cites the adopted editions and amendments, and records any interpretations or agreements reached. | RRevalidate Reviewer interpretations are recorded and carried back into the design, not only into the response letter. | DDocument Inspector interpretations and approved alternates recorded for this project and for the next one in the same jurisdiction. |
| Documentation and coordination Code analysis, life-safety plans, consultant drawings, specifications | EEstablish Decide where code assumptions will live and who owns them. Start the code analysis as a working document, not a deliverable. | DDocument Record early assumptions with the reasoning behind them, not only the conclusion. | VValidate Coordinate structural, MEP, and fire protection drawings against the code assumptions they depend on. | DDocument Code sheets, life-safety plans, and specifications agree with each other and with the model. | RRevalidate Every comment traced from response to the affected sheets and model elements. | DDocument RFIs, substitutions, and field changes with code implications recorded with their rationale. |